文献速递主动脉疾病

开放腹主动脉瘤修复手术延迟的预测因素与结局

Predictors and outcomes of surgical delay in open abdominal aortic aneurysm repair.
PubMed 文献 · J Vasc Surg · 2025-10-10

这项回顾性队列研究分析了2015至2025年间两个中心298例择期开放腹主动脉瘤修复患者,发现从术前CT到手术中位等待92天、从知情同意到手术中位等待61天,手术延迟与术后并发症负担小幅但显著增加相关。

要点

  • 择期开放AAA修复术前等待时间普遍较长,中位CT至手术时间为92天
  • 脑血管病、近肾动脉瘤和小AAA直径是同意至手术延迟的预测因素
  • 手术延迟与术后综合并发症指数小幅但显著升高相关,应提前识别高风险患者

核心结论

  • 择期开放腹主动脉瘤修复患者手术延迟远超8周时,术后并发症负担更高,应提前识别以确保及时干预。

研究设计与样本

  • 回顾性病历审查,纳入2015至2025年两个医院中心接受开放AAA修复的患者,排除非择期手术者,共纳入298例。

主要发现

  • 术前CT至手术中位时间92天(IQR 59-142,n=247),知情同意至手术中位时间61天(IQR 40-103,n=296)。
  • 血管外科就诊后至术前医学科评估中位等待21天(IQR 10-33,n=289)。
  • 仅较小动脉瘤直径是CT至手术延迟的显著预测因素(OR 0.915,95%CI 0.88-0.95,P=9.22e-6)。

关键数值与推荐

  • 手术延迟定义为等待时间>8周,从术前CT和知情同意日期分别评估至手术日。

临床怎么用

  • 对合并脑血管病、近肾动脉瘤或较小AAA直径的患者应提前识别手术延迟风险并优化流程以确保及时干预。

以上解读依据论文摘要(全文未开放获取或许可不允许翻译转载)。

原文

OBJECTIVE: The objectives of this study were to characterize surgical waiting times experienced by patients undergoing elective open abdominal aortic aneurysm (AAA) repair, as well as to identify predictors and adverse outcomes associated with surgical delay. METHODS: A retrospective chart review of patients undergoing open AAA repair between 2015 and 2025 was carried out in two hospital centers. Patients were excluded from the study if they were not scheduled to undergo an elective operation. Demographic, preoperative, and postoperative data were collected, including the time course between the preoperative abdominal computed tomography (CT) scan, procedure consent, preoperative clinic evaluation, and surgery date. Surgical delay was defined as a wait time of >8 weeks and assessed from both the preoperative CT scan and consent date to the day of surgery. Linear and logistic regression analyses were used to identify predictors and adverse postoperative outcomes of surgical delay. RESULTS: Of 468 charts reviewed, 298 patients were included in the study. The median time from the preoperative CT scan to surgery was 92 days (interquartile range [IQR], 59-142; n = 247), and the median time from the date of consent to surgery was 61 days (IQR, 40-103; n = 296). Patients waited a median of 21 days (IQR, 10-33 days; n = 289) after seeing the vascular surgeon to be assessed by preoperative medicine. Multivariable logistic regression showed that predictors of surgical delay from the time of consent to surgery were cerebrovascular disease (odds ratio, 5.209; 95% confidence interval [CI], 1.77-19.26; P = .006), juxtarenal aneurysms (odds ratio, 2.402; 95% CI, 1.36-4.35; P = .003) and smaller AAA diameter (odds ratio, 0.915; 95% CI, 0.88-0.95; P = 7.1e-6). Only smaller aneurysm diameter was a significant predictor of delay (odds ratio, 0.915; 95% CI, 0.88-0.95; P = 9.22e-6) from the time of the CT scan to surgery. Prolonged time to surgery was associated with a small but significant increase in the comprehensive complication index in both univariable (β = 0.426; 95% CI, 0.17-0.69; P = .001) and multivariable linear regression (β= 0.341; 95% CI, 0.10-0.58; P = .006). The incidence of interval ruptures (n = 1 [0.7%]) and symptomatic AAAs (n = 5 [1.7%]) in the waiting period were low. CONCLUSIONS: In this review, patients with prolonged surgical delay well beyond 8 weeks are at risk of experiencing a higher postoperative complication burden and should be identified preemptively to ensure timely intervention.

来源:J Vasc Surg,查看原文。版权归原作者所有。

引用

  1. Konci X, Laor B, Doonan RJ, et al. Predictors and outcomes of surgical delay in open abdominal aortic aneurysm repair. J Vasc Surg. 2025. PMID: 41077288. doi:10.1016/j.jvs.2025.10.005

供执业医师工作参考,不替代临床判断;数值与分级以指南原文为准。