脑室-腹腔分流与胃造瘘置管的最佳时机:一项全国性回顾性分析
该回顾性研究利用2016—2022年全国再入院数据库,纳入颅内出血并同时接受VPS和胃造瘘且两操作间隔≤10天的患者3334例。按操作顺序分三组:VPS先于胃造瘘>1天、胃造瘘先于VPS>1天、两者间隔≤1天。VPS先做组住院期中枢神经系统感染(10.5% vs 9.5%,aOR 1.52,95%CI 1.10–2.10,p=0.012)和分流失败需翻修(6.8% vs 4.9%,aOR 1.57,95%CI 1.03–2.41,p=0.038)显著高于胃造瘘先做组。出院后180天内延迟并发症无组间差异。作者认为结果主要为假设生成,但提示胃造瘘先于或与VPS间隔24小时内与更低的分流失败或感染风险相关。
要点
- 颅内出血患者VPS先于胃造瘘>1天者,住院期CNS感染风险更高(10.5% vs 9.5%,aOR 1.52,95%CI 1.10–2.10,p=0.012)。
- VPS先做组分流失败需翻修风险也更高(6.8% vs 4.9%,aOR 1.57,95%CI 1.03–2.41,p=0.038)。
- 胃造瘘先于VPS或两者间隔≤1天者,住院期CNS感染和分流失败与胃造瘘先做组无显著差异(p>0.05)。
- 出院后180天内延迟感染或翻修各组间均无显著差异(p>0.05)。
- 结果主要为假设生成,不能据此确立因果关系或改变常规顺序推荐。
适用人群与场景
- 2016—2022年全国再入院数据库中因颅内出血入院、并同时接受VPS和胃造瘘置管且两操作间隔≤10天的患者。
- 排除两操作间隔>10天者;原文未提及其他排除标准。
诊断标准与关键阈值
- 分组标准:VPS先于胃造瘘>1天;胃造瘘先于VPS>1天;两者间隔≤1天。
- 主要结局:住院期分流感染或翻修;出院后180天内延迟感染或翻修。
处置流程与药物剂量
- 原文未提及
红旗征与不能漏的情况
- 原文未提及
研究设计与关键结果
- 研究类型:全国性回顾性队列分析,样本量3334例,来自全国再入院数据库(2016—2022)。
- 人群:颅内出血后接受VPS和胃造瘘置管、两操作间隔≤10天的患者。
- 分组:VPS先于胃造瘘>1天(n=1254,44.7%);胃造瘘先于VPS>1天(n=1550,55.3%);两者间隔≤1天(n=530,15.9%)。
- 主要终点:VPS先做组住院期CNS感染10.5% vs 9.5%,aOR 1.52(95%CI 1.10–2.10),p=0.012;分流失败需翻修6.8% vs 4.9%,aOR 1.57(95%CI 1.03–2.41),p=0.038。
- 与胃造瘘先做组相比,VPS在胃造瘘后1天内完成者住院期CNS感染和分流失败无显著差异(p>0.05)。
- 出院后180天内延迟并发症各组间均无显著差异(p>0.05)。
证据类型、等级与局限
- 证据类型:全国性回顾性队列研究(基于行政数据库)。
- 局限:回顾性设计、行政数据库编码可能不精确、未随机分组、残余混杂可能、结果主要为假设生成。
对床旁实践的改变
- 对于颅内出血后需同时行VPS和胃造瘘的患者,可考虑胃造瘘先于VPS或两者间隔≤24小时,以降低住院期分流感染和翻修风险;但证据为回顾性假设生成,不能作为强制推荐。
- 不适用于两操作间隔>10天的患者;原文未提及其他适用或不适用人群。
指南或共识出处
- 原文未提及
以上提炼依据论文摘要(全文未开放获取,或许可不允许翻译转载);全文请点「阅读原文」。
英文原文(摘要)· 点击展开
BACKGROUND/OBJECTIVES: The transition of the neurologically injured patient from the intensive care unit (ICU) environment toward recovery often requires placement of a ventriculo-peritoneal shunt (VPS) and a gastrostomy tube (g-tube). Prior work has demonstrated a significant association between g-tube placement and shunt infection, however, both procedures are typically performed during the same hospitalization. Thus, there remains a question regarding the optimal timing of g-tube relative to VPS placement and the risk of subsequent complications. The objective of this study is to examine the risk of complications on the basis of relative timing of VPS and g-tube placement.
METHODS: Patients admitted for intracranial hemorrhage who underwent both VPS and g-tube placement within 10 days of each other were retrospectively identified in the Nationwide Readmissions Database from 2016 to 2022. Patients were divided into three groups: VPS > 1 day before g-tube, g-tube > 1 day before VPS, and both procedures within 1 day. Primary outcomes were inpatient shunt infection or revision and delayed infection or revision within 180-days post-discharge.
RESULTS: Overall, 3334 patients met the inclusion criteria. The most common period for the procedures to occur was within 24 h of each other. Excluding patients who received both VPS and g-tube within 1 day of separation (n = 530, 15.9%), 1254 (44.7%) received VPS first while 1550 (55.3%) received VPS second. Patients who received VPS first were significantly more likely to experience inpatient central nervous system (CNS) infection (10.5% vs. 9.5%, adjusted odds ratio (aOR): 1.52; 95% confidence interval (CI) 1.10-2.10; p = 0.012) and shunt failure requiring revision (6.8% vs. 4.9%, aOR 1.57 [95%CI 1.03-2.41], p = 0.038). Compared with the g-tube first group, those who received VPS within 1 day of g-tube had no significant differences in CNS infection or shunt failure (p > 0.05). There were no differences in delayed complications between groups within 180 days post-discharge (all p > 0.05).
CONCLUSIONS: While our results are primarily hypothesis generating, in this nationwide analysis, we demonstrate that g-tube placement before or within 24 h of VPS is associated with significantly lower odds of shunt failure or infection.
参考来源
- McIntyre MK, Chen HA, Gerges Castro C, et al. The Optimal Timing of Ventriculo-Peritoneal Shunting and Gastrostomy Tube Placement: A Nationwide Retrospective Analysis. Neurocrit Care. 2026. PMID: 42509481. doi:10.1007/s12028-026-02617-w
供执业医师抢救与诊疗参考,不替代临床判断;剂量请结合体重、肝肾功能和本院药品规格复核,以指南原文为准。