文献速递重症综合管理与镇静镇痛

2019至2021年新疆生产建设兵团重症医学人力资源与基础配置现状调查

[Survey on the current situation of human resources and basic configuration of the intensive care medicine in Xinjiang Production and Construction Corps from 2019 to 2021].
PubMed 文献 · Zhonghua Wei Zhong Bing Ji Jiu Yi Xue · 2024-01-01
一句话结论新疆生产建设兵团16家医院ICU床占比1.99%、医生床比0.55:1,均低于国家指南标准,高学历人才稀缺、核心技术进步缓慢。

该调查于2019年1月1日至2021年12月31日以问卷形式覆盖新疆生产建设兵团师级医院及周边二级医院的16个综合重症医学科,其中二级甲等医院5家、三级甲等医院11家。16个ICU共196张床,ICU床位占比总体1.99%、三级甲等医院1.77%,低于国家卫生健康委员会《重症医学科建设与管理指南(试行)》规定的2%-8%,仅二级甲等医院ICU床位占比2.65%达标;医生床比总体0.55:1、三级甲等医院0.60:1、二级甲等医院0.44:1,与部级指南0.8:1有差距。108名医生中仅4人硕士及以上,副高及以上职称占27.78%;334名护士无硕士及以上人员,副高及以上仅10人。2019至2021年新增硕士1人、正高2人、副高12人,核心技术的绝对增长统计分析显示增长缓慢、先进性不足、专业技术能力不足。结论认为该区域重症专业与人才梯队建设滞后、学科整体专业水平不高、缺乏专门人才。

要点

  • 16个ICU共196张床,ICU床位占比总体1.99%、三级甲等医院1.77%,低于国家卫生健康委员会《重症医学科建设与管理指南(试行)》2%-8%,仅二级甲等医院2.65%达标。
  • 综合ICU医生床比总体0.55:1、三级甲等医院0.60:1、二级甲等医院0.44:1,与部级指南0.8:1有差距。
  • 108名ICU医生中硕士及以上仅4人,副高及以上职称占27.78%(不足三分之一);334名护士无硕士及以上人员,副高及以上仅10人。
  • 2019至2021年新增硕士1人、正高2人、副高12人,高学历与高年资医护比例低、人才引进少、高学历人才稀缺。
  • 核心技术的绝对增长统计分析显示增长缓慢、先进性不足、专业技术能力不足。

适用人群与场景

  • 新疆生产建设兵团师级医院及周边二级医院的综合重症医学科,共16个ICU,包括二级甲等医院5家、三级甲等医院11家。
  • 调查时间为2019年1月1日至2021年12月31日,问卷于2022年3月发放,由各ICU指定主治医师及以上人员作为调查联系人。

研究设计与关键结果

  • 调查于2019年1月1日至2021年12月31日进行,问卷于2022年3月发放,发放16份、回收16份,全部纳入,覆盖兵团及周边地区16个综合重症医学科,其中二级甲等医院5家、三级甲等医院11家。
  • 16个ICU共196张床,ICU床位占比总体1.99%、三级甲等医院1.77%,低于国家卫生健康委员会《重症医学科建设与管理指南(试行)》规定的2%-8%;仅二级甲等医院ICU床位占比2.65%达到该标准。
  • 综合ICU医生床比16家医院为0.55:1、三级甲等医院0.60:1、二级甲等医院0.44:1,与部级指南规定的0.8:1有一定差距。
  • 16个ICU共108名医生,仅4人具有硕士及以上学历;副高及以上专业技术职称占27.78%,不足三分之一。
  • 334名护理人员中无硕士及以上学历人员,副高及以上专业技术职称仅10人。
  • 2019至2021年新增硕士学历人员1人、正高级专业技术职称人员2人、副高级专业技术职称人员12人。
  • 核心技术的绝对增长统计分析显示,核心技术增长缓慢、先进性不足、专业技术能力不足。

证据类型、等级与局限

  • 证据类型:问卷调查(2019年1月1日至2021年12月31日,问卷于2022年3月发放,发放16份、回收16份,全部纳入)。
  • 局限:原文未报告局限性。

对床旁实践的改变

  • 作者认为,兵团区域重症专业与人才梯队建设滞后、学科整体专业水平不高、缺乏专门人才,需在人才培养、技术发展培训、医疗质量管理等方面进一步改进,以保障医疗质量与安全。

指南或共识出处

  • 国家卫生健康委员会《重症医学科建设与管理指南(试行)》(原文引用其ICU床位占比2%-8%与医生床比0.8:1的规定)。

提炼说明

  • 本条依据论文摘要整理;摘要未涉及「诊断标准与关键阈值」「处置流程与药物剂量」「红旗征与不能漏的情况」,故未列出这些栏目;全文请点「阅读原文」。
英文原文(摘要)· 点击展开

OBJECTIVE: To comprehensively understand the basic situation of critical care medicine in Xinjiang Production and Construction Corps in order to promote the standardization, specialization, and systematization of quality control in critical care medicine.

METHODS: A survey was conducted from January 1, 2019, to December 31, 2021, using a questionnaire to investigate the human resources and basic allocation of comprehensive intensive care medicine departments in Xinjiang Production and Construction Corps division level hospitals and surrounding second-class hospitals. The survey content includes: basic situation of medical units, intensive care unit (ICU) basic information, ICU personnel situation, ICU equipment configuration situation, ICU performance situation, etc. The survey questionnaire was distributed in March 2022, with dedicated ICU attending physicians or above designated by each ICU as the contact person for the survey.

RESULTS: Sixteen questionnaires were distributed and returned, all of which were included from 16 comprehensive intensive care medicine departments in the Corps and surrounding areas, including 5 second class first class hospitals and 11 third class first class hospitals. There were 196 beds in 16 ICU units, and the ICU bed ratio (1.99% overall, 1.77% in third class first class hospitals) was lower than the 2%-8% stipulated in the Guidelines for the Construction and Management of Critical Care Medicine (Trial) issued by the National Health Commission. Only ICU beds in second class first class hospitals accounted for 2.65%, meeting this standard. The comprehensive ICU doctor-bed ratio in 16 hospitals was 0.55 : 1, third class first class hospitals was 0.60 : 1, and second class first class hospitals was 0.44 : 1, compared with 0.8 : 1 stipulated in the ministerial guidelines, there was a certain gap. Among the 108 doctors in 16 ICUs, only four have a master's degree or above. Associate senior and above professional and technical titles accounted for 27.78%, less than one third. Among the 334 nursing staff, there were no personnel with a master's degree or above, and only 10 personnel with associate senior or above professional and technical titles. From 2019 to 2021, there were 1 new master's degree personnel, 2 new senior professional and technical personnel, and 12 deputy senior professional and technical personnel. It indicating that the proportion of highly educated and experienced physicians and nurses were lower, team building lags behind, talent introduction were lower, and highly educated talents were scarce. The statistical analysis results of the absolute growth of core technology showed that the growth of core technology was slow, the progressiveness was insufficient, and the professional technical ability was insufficient.

CONCLUSIONS: The construction of critical care majors and talent echelons in the Xinjiang Production and Construction Corps region is lagging behind, the overall professional level of the discipline is not high, and there is a lack of specialized personnel. Further improvement is needed in talent cultivation, technical development and training, medical quality management, and other aspects to ensure medical quality and safety.

来源:Zhonghua Wei Zhong Bing Ji Jiu Yi Xue,查看原文。版权归原作者所有。

参考来源

  1. Li X, Zhang Q, Qin M, et al. [Survey on the current situation of human resources and basic configuration of the intensive care medicine in Xinjiang Production and Construction Corps from 2019 to 2021]. Zhonghua Wei Zhong Bing Ji Jiu Yi Xue. 2024. PMID: 39697028. doi:10.3760/cma.j.cn121430-20231029-00920

供执业医师抢救与诊疗参考,不替代临床判断;剂量请结合体重、肝肾功能和本院药品规格复核,以指南原文为准。